From the 2026 archive
Two dates. One deposit.
A solar or storage developer could file on time in June and still lose up to €7,000 in September. Ireland’s regulator required a pre-application and deposit by 30 June, then a valid grid application by 30 September. A late or invalid second filing forfeited the deposit.
Read the regulator’s decision